  • Project Location: Dallas, TX
  • Owner/Client: Alterra
  • Project Description:

This 100 year old building was being turned into apartments and a hotel, totaling 9 floors and 577 rooms. The owner needed a highly efficient system that wouldn’t disrupt the façade of the historic building. VRV met these needs with its modular configuration, and allowed the owner to receive revenue quickly by finishing out the apartments first. In total, with four 8000 CFM Daikin MPS 100% OAUs with enthalpy wheels were installed, creating a heat recovery system to maximize heating and cooling efficiency in each room.

Butler Bros & Marriott at Ervay 1

Hospitality Key Considerations