Project Portfolio

Home Project North Oak Middle School

North Oak Middle School

  • Project Location: Haltom City, TX
  • Owner/Client: Birdville ISD
  • Project Description:

Birdville ISD recently renovated its North Oak Middle School campus in Haltom City, Texas. The existing console units in the renovated wing were outdated and deteriorating, and the school district was looking for an energy efficient solution that could be easily fitted into their existing system. DXS was chosen as basis of design for the project based on the level of design and their experience working with MEP Engineer IEG.

The school was equipped with 28 tons of Daikin VRV heat recovery, including 11 cassettes with self-cleaning decoration panels. North Oak is one of the first schools to utilize the self-cleaning filter panels provided on the 3’ by 3’ cassettes, which allow for significantly less maintenance time and cost, as well as a 30 percent increase in efficiency. DXS was able to overcome scheduling challenges in order to provide equipment in a timely manner and reduce the construction time of the project.

Education Key Considerations

School district facilities planners and maintenance personnel plus the design team who support them are tasked with developing and maintaining usable, comfortable buildings that promote learning. They must do this across the country under the scrutiny of school districts determined to spend every bond and tax revenue dollar wisely.

The DXS team understands the pressures under which school district personnel operate and we’ve helped alleviate much of that pressure. From our work with facilities planners and architects, we know that energy is one of the largest line items in a school budget. That’s where we can help. We design low-maintenance VRF air conditioning systems that reduce HVAC energy costs 20 to 50 percent.

Key Considerations

  • Systems that reduce HVAC energy costs by 20 to 50 percent
  • Opportunity to reduce overall building construction cost
  • Straightforward maintenance facilities crews can easily manage
  • Reduced maintenance costs compared to split-system or chilled water systems
  • Reduced mechanical space
  • Designs that accommodate space restrictions of prior systems
  • Ability to handle temperature control for dozens of small spaces
  • Energy efficient
  • Robust training program for facilities maintenance personnel
  • DXS onsite at five key junctures: onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment