Project Portfolio

Home Project Scott & White Hospital

Scott & White Hospital

  • Project Location: Round Rock, TX
  • Owner/Client: Scott & White
  • Project Description:

Scott & White Healthcare System’s new hospital campus in Round Rock serves patients in Williamson and northern Travis Counties with a full-service 101 bed hospital, ER, primary care clinic and multi-specialty clinics. The facility needed equipment that was able to accommodate for long refrigerant line runs. DXS was chosen as basis of design for its ability to fulfill this requirement with its offering of high-quality Daikin AC equipment. DXS provided a 6-ton Daikin heat recovery system with eight zones, ducted fan coil units, an 8-ton Daikin heat pump system and a 10-ton Daikin heat pump system.

Healthcare Key Considerations

At a time when hospitals and medical services must find new ways to reduce costs, DXS offers one solution that has nothing to do with diagnoses and treatments.

Our team partners with architects and mechanical engineers who specialize in healthcare construction to design VRF air conditioning systems for hospitals, medical office buildings, long-term care facilities, and 24-hour emergency care clinics.  With an in-depth understanding of the compliance issues of these structures, we deliver energy-efficient systems that reduce overall operating costs.  Our clients also appreciate that VRF systems provide comfort to patients through greater temperature control of individual patient rooms.

Key Considerations

  • In-depth understanding of healthcare building codes
  • Systems have the ability to reduce and eliminate cross contamination of air sources
  • Tight temperature control of multiple zones for individual patient rooms
  • Opportunity to reduce overall construction cost
  • Energy-efficient system reduces energy costs 20 to 50 percent
  • Similar benefits for Assisted Living facilities
  • DXS onsite at five key junctures:  onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment