The Jack Condo 1

The Jack Condo

Project Location: Toronto, ON

Owner/Client: Aspen Ridge Homes

Category: Multi-Family

Contact Us

Description

The Jack Condo brings luxury living to a site that was formerly occupied by CHUM radio. This 11-story building offers residents great amenities such as a huge outdoor terrace and a sanctuary for private gatherings, yoga, and fitness studios, and is conveniently located in one of Toronto’s busiest neighborhoods.

The Jack Condo required 300 tons of Daikin VRV products and was one of the first large VRV projects completed in Toronto.

DXS supplied the following equipment:

  • Daikin Heat Recovery Condensing Unit
  • Daikin Heat Pump Condensing Unit
  • Daikin VRV Indoor Unit Fan Coils

Education Key Consideration

School district facilities planners and maintenance personnel plus the design team who support them are tasked with developing and maintaining usable, comfortable buildings that promote learning. They must do this across the country under the scrutiny of school districts determined to spend every bond and tax revenue dollar wisely.

The DXS team understands the pressures under which school district personnel operate and we’ve helped alleviate much of that pressure. From our work with facilities planners and architects, we know that energy is one of the largest line items in a school budget. That’s where we can help. We design low-maintenance VRF air conditioning systems that reduce HVAC energy costs 20 to 50 percent.

Key Considerations

  • Systems that reduce HVAC energy costs by 20 to 50 percent
  • Opportunity to reduce overall building construction cost
  • Straightforward maintenance facilities crews can easily manage
  • Reduced maintenance costs compared to split-system or chilled water systems
  • Reduced mechanical space
  • Designs that accommodate space restrictions of prior systems
  • Ability to handle temperature control for dozens of small spaces
  • Energy efficient
  • Y Robust training program for facilities maintenance personnel
  • DXxsS onsite at five key junctures: onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment